A predictable path with honest milestones. We tell you what comes next, when it comes, and what we need from you to make it happen on schedule. A lifetime warranty waits at the end.
We meet at your home or our Naples shop. Either way, we want to see the room, the plan, the appliances you have your heart set on. We look at inspiration photos, talk through how you actually live in the space, and surface the questions you didn't know to ask.
If we are a fit, we set up the measure visit. If we are not, we'll point you at someone who is. There is no charge for the first conversation, and no obligation to proceed.
Our lead craftsman comes on-site with the tools to capture every meaningful dimension. Walls measured at three heights, plumbing rough-ins located to the millimeter, floor dips and ceiling rises documented.
We measure twice because we cut once. Bad measurements are the single most common cause of bad cabinets, and we will not start a build until ours are right.
Two design rounds are standard. We deliver scaled elevations, floor plans, and a perspective rendering. You see the kitchen before it exists. We hand you wood blocks, finish samples, and physical hardware so you can carry them to your home and see them in your own morning light.
We revise. We talk. We revise again. When the design is right, you sign it and we order materials.
Each cabinet is built by name in our 10,000-square-foot Naples shop. Face frames are pocket-screwed and pinned. Drawer boxes are machine-dovetailed and assembled with hide glue. Boxes are 3/4-inch plywood with a mortised back panel.
The finish goes on in our spray booth, by hand, in three coats minimum. Each coat sanded by hand between. Then a final hand-buff. The whole shop knows whose cabinet is going out the door — and whose name is on it.
Our installers arrive in clean trucks with floor protection, dust barriers, and the patience to scribe filler strips to the millimeter. They protect the floors, they protect the walls, they protect the new appliances. They clean up nightly.
Most kitchens install in five to seven working days. We coordinate directly with your countertop fabricator, your plumber, and your electrician so the room is ready for use the moment the last drawer pull goes on.
Lifetime warranty on cabinet construction for the original homeowner. Drawer slides and hinges are covered for ten years. Finishes carry a three-year warranty against checking and lift.
And if something we built is not behaving the way it should — call us. We answer the phone. We come back. The studio is right here on J&C Blvd and we plan to be here for as long as Naples homeowners deserve this kind of work — which is to say for the foreseeable future.
No charge, no obligation. Just bring photos and a rough floor plan.